Tag: Colorado

  • 43-U.S.C.-1511

    43-U.S.C.-1511 §1511 – Reconnaissance Investigations By Secretary of The Interior; Reports; 10-Year Moratorium On Water Importation Studies Pathway Title 43 > Chapter 32 > Subchapter II > Section 1511 Details Reference: Section 1511 Legend: §1511 – Reconnaissance Investigations By Secretary of The Interior; Reports; 10-Year Moratorium On Water Importation Studies USCode Year: 2013 Provision Content Pursuant to the authority set out…

  • 43-U.S.C.-1600E

    43-U.S.C.-1600E §1600E – Exceptions Pathway Title 43 > Chapter 32B > Section 1600e Details Reference: Section 1600e Legend: §1600E – Exceptions USCode Year: 2013 Provision Content Notwithstanding section 1600d of this title, the appropriate Federal officer, after consultation with the Secretary, may make Federal expenditures or financial assistance available within the Colorado River Floodway for— (a) any dam, channel…

  • 43-U.S.C.-1600E

    43-U.S.C.-1600E §1600E – Exceptions Pathway Title 43 > Chapter 32B > Section 1600e Details Reference: Section 1600e Legend: §1600E – Exceptions USCode Year: 2013 Provision Content Notwithstanding section 1600d of this title, the appropriate Federal officer, after consultation with the Secretary, may make Federal expenditures or financial assistance available within the Colorado River Floodway for— (a) any dam, channel…

  • 43-U.S.C.-1597

    43-U.S.C.-1597 §1597 – Construction of Provisions of Subchapter Pathway Title 43 > Chapter 32A > Subchapter II > Section 1597 Details Reference: Section 1597 Legend: §1597 – Construction of Provisions of Subchapter USCode Year: 2013 Provision Content Except as provided in sections 620d(d)(5), 1543(g)(2), and 1595(b) of this title, with respect to the Colorado River Basin Project Act [43 U.S.C. 1501…

  • 43-U.S.C.-1528

    43-U.S.C.-1528 §1528 – Authorization of Appropriations Pathway Title 43 > Chapter 32 > Subchapter III > Section 1528 Details Reference: Section 1528 Legend: §1528 – Authorization of Appropriations USCode Year: 2013 Provision Content (a) There is hereby authorized to be appropriated for construction of the Central Arizona Project, including prepayment for power generation and transmission facilities but exclusive of distribution and…

  • 43-U.S.C.-1551

    43-U.S.C.-1551 §1551 – Construction of Colorado River Basin Act Pathway Title 43 > Chapter 32 > Subchapter V > Section 1551 Details Reference: Section 1551 Legend: §1551 – Construction of Colorado River Basin Act USCode Year: 2013 Provision Content (a) Effect on other laws Nothing in this chapter shall be construed to alter, amend, repeal, modify, or be in conflict with…

  • 43-U.S.C.-1592

    43-U.S.C.-1592 §1592 – Authorization to Construct, Operate, and Maintain Salinity Control Units and Salinity Control Programs Pathway Title 43 > Chapter 32A > Subchapter II > Section 1592 Details Reference: Section 1592 Legend: §1592 – Authorization to Construct, Operate, and Maintain Salinity Control Units and Salinity Control Programs USCode Year: 2013 Provision Content (a) Authority of Secretary The Secretary is authorized…

  • 43-U.S.C.-615AAA

    43-U.S.C.-615AAA §615Aaa – §§615Aaa to 615Iii. Omitted Pathway Title 43 > Chapter 12 > Subchapter XXXI > Section 615aaa Details Reference: Section 615aaa Legend: §615Aaa – §§615Aaa to 615Iii. Omitted USCode Year: 2013 Provision Content Codification Section 615aaa, Pub. L. 92–514, title I, §101, Oct. 20, 1972, 86 Stat. 964; Pub. L. 96–375, §6(a), Oct. 3, 1975, 94 Stat. 1507; Pub.…

  • 43-U.S.C.-1514

    43-U.S.C.-1514 §1514 – Authorization of Appropriations Pathway Title 43 > Chapter 32 > Subchapter II > Section 1514 Details Reference: Section 1514 Legend: §1514 – Authorization of Appropriations USCode Year: 2013 Provision Content There are authorized to be appropriated such sums as are required to carry out the purposes of this subchapter. (Pub. L. 90–537, title II, §204, Sept. 30, 1968,…

  • 43-U.S.C.-1521

    43-U.S.C.-1521 §1521 – Central Arizona Project Pathway Title 43 > Chapter 32 > Subchapter III > Section 1521 Details Reference: Section 1521 Legend: §1521 – Central Arizona Project USCode Year: 2013 Provision Content (a) Construction and operation; Hayden-Rhodes Aqueduct and pumping plants; Orme Dam and Reservoir; Buttes Dam and Reservoir; Hooker Dam and Reservoir; Charleston Dam and Reservoir; Tucson aqueducts and…