42-U.S.C.-7514

42-U.S.C.-7514

§7514 – Plan Submission Deadlines

Pathway

Title 42 > Chapter 85 > Subchapter I > Part D > Subpart 5 > Section 7514

Details

  • Reference: Section 7514
  • Legend: §7514 – Plan Submission Deadlines
  • USCode Year: 2011

Provision Content

(a) Submission

Any State containing an area designated or redesignated under section 7407(d) of this title as nonattainment with respect to the national primary ambient air quality standards for sulfur oxides, nitrogen dioxide, or lead subsequent to November 15, 1990, shall submit to the Administrator, within 18 months of the designation, an applicable implementation plan meeting the requirements of this part.

(b) States lacking fully approved State implementation plans

Any State containing an area designated nonattainment with respect to national primary ambient air quality standards for sulfur oxides or nitrogen dioxide under section 7407(d)(1)(C)(i) of this title, but lacking a fully approved implementation plan complying with the requirements of this chapter (including this part) as in effect immediately before November 15, 1990, shall submit to the Administrator, within 18 months of November 15, 1990, an implementation plan meeting the requirements of subpart 1 (except as otherwise prescribed by section 7514a of this title).

(July 14, 1955, ch. 360, title I, §191, as added Pub. L. 101–549, title I, §106, Nov. 15, 1990, 104 Stat. 2463.)

U.S. Encyclopedia of Law Coverage

42-U.S.C.-7509A in the Legal Encyclopedia: Air Pollution

In this entry about 42-U.S.C.-7509A, find legal reference material, bibliographies and premiere content related to air pollution in the American Encyclopedia of Law, presenting a comprehensive view of the United States air pollution-specific issues, written by authorities in the field.

Topic Map


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *