42-U.S.C.-7514A

42-U.S.C.-7514A

§7514A – Attainment Dates

Pathway

Title 42 > Chapter 85 > Subchapter I > Part D > Subpart 5 > Section 7514a

Details

  • Reference: Section 7514a
  • Legend: §7514A – Attainment Dates
  • USCode Year: 2011

Provision Content

(a) Plans under section 7514(a)

Implementation plans required under section 7514(a) of this title shall provide for attainment of the relevant primary standard as expeditiously as practicable but no later than 5 years from the date of the nonattainment designation.

(b) Plans under section 7514(b)

Implementation plans required under section 7514(b) of this title shall provide for attainment of the relevant primary national ambient air quality standard within 5 years after November 15, 1990.

(c) Inadequate plans

Implementation plans for nonattainment areas for sulfur oxides or nitrogen dioxide with plans that were approved by the Administrator before November 15, 1990, but, subsequent to such approval, were found by the Administrator to be substantially inadequate, shall provide for attainment of the relevant primary standard within 5 years from the date of such finding.

(July 14, 1955, ch. 360, title I, §192, as added Pub. L. 101–549, title I, §106, Nov. 15, 1990, 104 Stat. 2463.)

U.S. Encyclopedia of Law Coverage

42-U.S.C.-7509A in the Legal Encyclopedia: Air Pollution

In this entry about 42-U.S.C.-7509A, find legal reference material, bibliographies and premiere content related to air pollution in the American Encyclopedia of Law, presenting a comprehensive view of the United States air pollution-specific issues, written by authorities in the field.

Topic Map


Posted

in

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *