33-U.S.C.-419A
§419A – Management Practices to Extend Capacity and Useful Life of Dredged Material Disposal Areas
Pathway
Title 33 > Chapter 9 > Subchapter I > Section 419a
Details
- Reference: Section 419a
- Legend: §419A – Management Practices to Extend Capacity and Useful Life of Dredged Material Disposal Areas
- USCode Year: 2013
Provision Content
The Secretary of the Army, acting through the Chief of Engineers, shall utilize and encourage the utilization of such management practices as he determines appropriate to extend the capacity and useful life of dredged material disposal areas such that the need for new dredged material disposal areas is kept to a minimum. Management practices authorized by this section shall include, but not be limited to, the construction of dikes, consolidation and dewatering of dredged material, and construction of drainage and outflow facilities.
(Pub. L. 94–587, §148, Oct. 22, 1976, 90 Stat. 2931.)
U.S. Encyclopedia of Law Coverage
33-U.S.C.-403B in the Legal Encyclopedia: Harbor
In this entry about 33-U.S.C.-403B, find legal reference material, bibliographies and premiere content related to harbor in the American Encyclopedia of Law, presenting a comprehensive view of the United States harbor-specific issues, written by authorities in the field.
Leave a Reply