33-U.S.C.-570

33-U.S.C.-570

§570 – Default In Contract; Disposition of Amounts Collected

Pathway

Title 33 > Chapter 12 > Subchapter I > Section 570

Details

  • Reference: Section 570
  • Legend: §570 – Default In Contract; Disposition of Amounts Collected
  • USCode Year: 2013

Provision Content

Any amounts collected from defaulting contractors or their sureties under contracts entered into in connection with river and harbor or flood-control work prosecuted by the Engineer Department, whether collected in cash or by deduction from amounts otherwise due such contractors, hereafter shall be credited in each case to the appropriation under which the contract was made.

(Aug. 30, 1935, ch. 831, §8, 49 Stat. 1048.)

U.S. Encyclopedia of Law Coverage

33-U.S.C.-567B-1 in the Legal Encyclopedia: Harbor

In this entry about 33-U.S.C.-567B-1, find legal reference material, bibliographies and premiere content related to harbor in the American Encyclopedia of Law, presenting a comprehensive view of the United States harbor-specific issues, written by authorities in the field.

Topic Map


Posted

in

,

by

Tags:

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *