43-U.S.C.-390H-12J
§390H-12J – §390H-12J. Orange County Regional Water Reclamation Project
Pathway
Title 43 > Chapter 12 > Subchapter I > Section 390h-12j
Details
- Reference: Section 390h-12j
- Legend: §390H-12J – §390H-12J. Orange County Regional Water Reclamation Project
- USCode Year: 2013
Provision Content
(a) Authorization
The Secretary, in cooperation with the appropriate State and local authorities, is authorized to participate in the design, planning, and construction of the Orange County Regional Water Reclamation Project, to reclaim and reuse water within the service area of the Orange County Water District in California.
(b) Cost share
The Federal share of the cost of a project described in subsection (a) of this section shall not exceed 25 percent of the total cost.
(c) Limitation
The Secretary shall not provide funds for the operation or maintenance of a project described in subsection (a) of this section.
(Pub. L. 102–575, title XVI, §1624, as added Pub. L. 104–266, §2(a)(2), Oct. 9, 1996, 110 Stat. 3292; amended Pub. L. 111–11, title IX, §9111(c), Mar. 30, 2009, 123 Stat. 1318.)
Amendments
2009—Pub. L. 111–11, §9111(c)(1), struck out Phase 1 of the before Orange County in section catchline.
Subsec. (a). Pub. L. 111–11, §9111(c)(2), struck out phase 1 of before the Orange County.
U.S. Encyclopedia of Law Coverage
43-U.S.C.-390G-8 in the Legal Encyclopedia: Public Lands
In this entry about 43-U.S.C.-390G-8, find legal reference material, bibliographies and premiere content related to public lands in the American Encyclopedia of Law, presenting a comprehensive view of the United States public lands-specific issues, written by authorities in the field.
Leave a Reply