43-U.S.C.-390H-36
§390H-36 – §390H-36. Lower Chino Dairy Area Desalination Demonstration and Reclamation Project
Pathway
Title 43 > Chapter 12 > Subchapter I > Section 390h-36
Details
- Reference: Section 390h-36
- Legend: §390H-36 – §390H-36. Lower Chino Dairy Area Desalination Demonstration and Reclamation Project
- USCode Year: 2013
Provision Content
(a) In general
The Secretary, in cooperation with the Chino Basin Watermaster, the Inland Empire Utilities Agency, and the Santa Ana Watershed Project Authority and acting under the Federal reclamation laws, shall participate in the design, planning, and construction of the Lower Chino Dairy Area desalination demonstration and reclamation project.
(b) Cost sharing
The Federal share of the cost of the project described in subsection (a) shall not exceed—
(1) 25 percent of the total cost of the project; or
(2) $26,000,000.
(c) Limitation
Funds provided by the Secretary shall not be used for operation or maintenance of the project described in subsection (a).
(d) Authorization of appropriations
There are authorized to be appropriated such sums as are necessary to carry out this section.
(e) Sunset of authority
This section shall have no effect after the date that is 10 years after March 30, 2009.
(Pub. L. 102–575, title XVI, §1653, as added Pub. L. 111–11, title IX, §9111(b)(1), Mar. 30, 2009, 123 Stat. 1317.)
References in Text
The Federal reclamation laws, referred to in subsec. (a), are defined in section 390h(a) of this title.
U.S. Encyclopedia of Law Coverage
43-U.S.C.-390H-16 in the Legal Encyclopedia: Public Lands
In this entry about 43-U.S.C.-390H-16, find legal reference material, bibliographies and premiere content related to public lands in the American Encyclopedia of Law, presenting a comprehensive view of the United States public lands-specific issues, written by authorities in the field.
Leave a Reply