50-U.S.C.-2535

50-U.S.C.-2535

§2535 – Replacement Project For Chemistry and Metallurgy Research Building, Los Alamos National Laboratory, New Mexico

Pathway

Title 50 > Chapter 42 > Subchapter II > Part A > Section 2535

Details

  • Reference: Section 2535
  • Legend: §2535 – Replacement Project For Chemistry and Metallurgy Research Building, Los Alamos National Laboratory, New Mexico
  • USCode Year: 2012

Provision Content

(a) Replacement building required

The Secretary of Energy shall construct at Los Alamos National Laboratory, New Mexico, a building to replace the functions of the existing Chemistry and Metallurgy Research Building at Los Alamos National Laboratory associated with Department of Energy Hazard Category 2 special nuclear material operations.

(b) Limitation on cost

The cost of the building constructed under subsection (a) may not exceed $3,700,000,000. If the Secretary determines the cost will exceed such amount, the Secretary shall submit a detailed justification for such increase to the congressional defense committees.

(c) Project basis

The construction authorized by subsection (a) shall use as its basis the facility project in the Department of Energy Readiness and Technical Base designated 04–D–125 (chemistry and metallurgy facility replacement project at Los Alamos National Laboratory).

(d) Assistance

(1) In carrying out this section, the Secretary shall procure the services of the Commander of the Naval Facilities Engineering Command to assist the Secretary with respect to the program management, oversight, and design activities of the project authorized by subsection (a).

(2) The Secretary shall carry out this subsection using funds made available for the National Nuclear Security Administration.

(e) Deadline for commencement of operations

The building constructed under subsection (a) shall commence operations by not later than December 31, 2026.

(Pub. L. 107–314, div. D, title XLII, §4215, as added Pub. L. 112–239, div. C, title XXXI, §3114(a)(1), Jan. 2, 2013, 126 Stat. 2170.)

Alternative Plutonium Strategy; Full Operational Capability of Replacement Project

Pub. L. 112–239, div. C, title XXXI, §3114(c)–(e), Jan. 2, 2013, 126 Stat. 2171, 2172, provided that:

(c) Limitation on Alternative Plutonium Strategy.—No funds authorized to be appropriated by this Act [see Tables for classification] or any other Act may be obligated or expended on any activities associated with a plutonium strategy for the National Nuclear Security Administration that does not include achieving full operational capability of the replacement project by December 31, 2026, as required by section 4215(e) of the Atomic Energy Defense Act [50 U.S.C. 2535(e)], as added by subsection (a).

(d) Naval Reactor Study.—

(1) In general.—The Deputy Administrator for Naval Reactors shall conduct a study of the replacement project, including an analysis of the cost, benefits, and risks with respect to nuclear safety.

(2) Submission.—Not later than 18 months after the date of the enactment of this Act [Jan. 2, 2013], the Deputy Administrator shall submit to the congressional defense committees [Committees on Armed Services and Appropriations of the Senate and the House of Representatives] a report on the study under paragraph (1), including recommendations of the Deputy Administrator with respect to the project structure, oversight model, and potential cost savings of the replacement project.

(3) Consideration of recommendations.—In carrying out the replacement project, the Secretary of Energy shall consider the recommendations made by the Deputy Administrator in the report under paragraph (2) and incorporate such recommendations into the project as the Secretary considers appropriate.

(4) Funding.—The Secretary of Energy and the Deputy Administrator shall carry out this subsection using funds authorized to be appropriated by this Act [see Tables for classification] or otherwise made available for the National Nuclear Security Administration that are not made available for the Naval Nuclear Propulsion Program.

(e) Replacement Project Defined.—In this section [enacting this section and this note], the term ‘replacement project’ means the replacement project for the Chemistry and Metallurgy Research Building authorized by section 4215 of the Atomic Energy Defense Act [50 U.S.C. 2535], as added by subsection (a).”

U.S. Encyclopedia of Law Coverage

50-U.S.C.-2521 in the Legal Encyclopedia: National Defense

In this entry about 50-U.S.C.-2521, find legal reference material, bibliographies and premiere content related to national defense in the American Encyclopedia of Law, presenting a comprehensive view of the United States national defense-specific issues, written by authorities in the field.

50-U.S.C.-2528 in the Legal Encyclopedia: Nuclear Power

In this entry about 50-U.S.C.-2528, find legal reference material, bibliographies and premiere content related to nuclear power in the American Encyclopedia of Law, presenting a comprehensive view of the United States nuclear power-specific issues, written by authorities in the field.

50-U.S.C.-2532 in the Legal Encyclopedia: Atomic Energy Defense

In this entry about 50-U.S.C.-2532, find legal reference material, bibliographies and premiere content related to atomic energy defense in the American Encyclopedia of Law, presenting a comprehensive view of the United States atomic energy defense-specific issues, written by authorities in the field.

Topic Map


Posted

in

,

by

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *